Why is the slack allowance editable?
CrewMeasure starts at 10%, but job conditions such as box drops, splices, and service loops can require a different allowance.
Estimate Tier 1 wire footage, boxes, and outlets with an editable slack allowance.
You'll need — ft of wire and — boxes for this job.
Add a row for each branch-circuit run, then adjust the visible slack allowance for the job.
No wire runs entered yet. Wire footage stays blank until at least one run has a length.
Simple user-entered tally by type; these counts are not inferred from the run lengths.
Optional. Enter a box volume and at least one conductor to check required box-fill volume against the box you're using. Skipped when left off.
Optional. Solves the minimum conductor size for a target voltage-drop budget using standard Ohm's-law-family physics and public AWG resistivity constants. Skipped when left off.
Optional. Tag devices by location to raise a check-this prompt on the common GFCI cases (kitchen countertop, bathroom, garage, outdoor, unfinished basement/crawlspace) and on bedroom AFCI. These are prompts, not the code's own lists, and a device left unflagged has only not been checked.
Optional. Suggests circuit groupings so each circuit's summed load stays at or under 80% of the breaker rating. Simple rule of thumb -- verify locally before finalizing panel scheduling.
You'll need — ft of wire and — boxes for this job.
You'll need
Included: wire footage with slack allowance, cable staples/straps, junction boxes, device boxes, receptacles, switches.
Not included: labor, permits, inspection fees, fixtures and fittings beyond what's itemized above.
Estimated -- a purchasing figure at the ordinary trade spacing, plus one strap at each box. It is NOT a securing schedule and cites no code section: the required support interval, how close a strap must sit to each box, and what counts as supported where cable passes through bored framing all come from the code book and the cable's own listing. Counted off the base run footage, because the slack allowance is coiled at the boxes rather than run along framing.
Advanced code table lookup is not available until reference data is verified.
Sum your actual run lengths, keep the slack assumption visible, and use the tally fields for simple box and outlet counts.
CrewMeasure starts at 10%, but job conditions such as box drops, splices, and service loops can require a different allowance.
Conduit fill needs verified NEC Chapter 9 Table 4 and Table 5 datasets. CrewMeasure does not substitute unverified values.
This is a general reference and material-estimate tool only. Verify local requirements, equipment specifications, and field conditions before installation.